Date: 18/11/2017
Name:
Email: Keep my email address private
Reply:
**Your comments must be approved before they appear on the site.
:
Authentication:  
10 + 4 = ?: (Required)
Enter the correct answer to the math question.

  
clear
You are posting a comment about...
Case Study: How to Replace a 250 ton Cooling Tower

Scott Jackson, Commercial Accounts Manager, introduces this video showing how a 28 year old cooling tower in the Plaza Tower office building in Nashville's Metrocenter was replaced.

The job was done in the winter so that a reliable system would be available for the next summer.  An air conditioning failure in a tight building this size would make the facility almost uninhabitable until the unit could be fixed. The loss of work hours for a large number of occupants could be costly. Miguel Ciera, Job Superintendent, and Michael McCormick, Pipe Fitter, explain the steps involved.